Penrose Dock

Steel Fabrication included Precambered steel, 120 Minute Fire Protection over 1000 No Service Opes in the webs of steel to allow M&E to run through. Over 600 Techrete Brackets welded to the edge beams to support the Architectural precast.

Project:
Penrose Dock, Cork
Client:
John Cleary Developments
Size:
1800 Tn
Scope:
Structural Steel, Intumescent, Metal Deck
Architect:
Wilson Architecture
Engineer:
Murphy Matson O’Sullivan
Main Contractor:
PJ Hegarty & Sons